 Dismantling of
100T travelling dockyard cranes -
approx 200ft high - at Yarrow shipyard |
 A typical example
of a finished site (for Glasgow
City Council) |
 Demolition of 4-storey whisky bond. Demolished with the use of Nicholson's high-reach excavators equipped
with concrete pulverisors. A fleet of
mini-diggers was utilised on several areas of the structure. |
|
 Civil
Engineering Work carried out for
Wimpey Construction during the M77 bypass construction
|
 Demolition of
high-rise water tower carried out
during the demolition of the Caterpillar factory at Uddingston. A "controlled
collapse" method was used to bring the tower safely to the ground. |
| |
 |
 |
Machine demolition of traditional council tenement
properties throughout Scotland.
Examples shown are at Milton and Yoker, for Glasgow City Council. |
 |
Demolition of St Leonards Secondary School for Glasgow City Council |
 Example of Mobile
on-site crushing including testing
of crushed material |
|
| One of our radio-controlled trucks |